How To Mix Back Fill Trowelable Concrete

A how to guide on mixing HardMaster W610 back fill trowelable concrete. Including mix instructions and water ratio amounts. 

Read more →

How To Install PatchBound Resin Bound

A how to guide on installing Meon’s resin PatchBound kit. PatchBound is part of the reinstatement range of Magma and is made up of 2 part resin and aggregate to deliver an encapsulated resin bound surface. 

Read more →

How To Apply Preformed MagmaLine

A quick how to video on the application of preformed thermoplastic. In this video we are applying MagmaLine premium grade thermoplastic, but the same application methods apply for preformed directional markings. Preformed thermoplastic is an extremely effective way of marking out parking bays or roadways around your facility with the use of a gas torch.

Read more →

How To Apply Crack Infill And Overbanding

How to apply crack infill and overbanding using cold lay materials. In this article we are using Meon’s highly durable MMA cold plastic product UltraCrack, designed for crack infill and overbanding. UltraCrack is an easy to apply fast curing kit available from Meon.

Read more →

How To Apply Bedding Mortar For Ironworks

A how to guide on mixing HardMaster Bedding Mortars. Including mix instructions and water ratio amounts.

Read more →