PORTSMOUTH COUNCIL LAKESIDE CAR PARK

Lakeside Office Park was acquired by Portsmouth City Council in August 2019. The asset was originally developed in 1976 and the carparking and roadway areas included significant volumes of concrete, which have since been overlaid using asphalt systems. Where vertical joints had not been created in the asphalt, the movement of the old concrete slabs has resulted in surface failures in the asphalt. A full resurfacing programme would be ideal, but wasn’t in the two-year maintenance budget, so an alternative solution was needed.

Read more →

RAF DALTON

When internal surface markings need to be repainted, there is usually the need for it to be a quick, cost-effective job which is why the most critical factor of the whole process often gets missed, the surface preparation.

Read more →

RAF DALTON ULTRACRACK L275

The contractor New Looks Oxon were undertaking major works to one of the hangars at RAF Dalton, including a complete repainting of the concrete floor.

Read more →